Saturday, July 18, 2009

On the 16 July 2009 I was on the causeway bridge taking photographs of the first high tide to go through the partially constructed marina. Until then a sand cofferdam had surrounded the construction area. The sand had been pushed flat by diggers.

It seems it was also used as an opportunity to flush out some pollution into the estuary.

While watching one of the local fish and chip shop owners walked past and stood to watch as well. He asked “Does that marina basin have no back wall?” The design of the marina is such that the tide goes in the entrance and then out over the top at the back of the basin (visa versa when the tide is goes out). Pointing to the basin he said “I’ve got one of those at work, its called a grease trap.”