Within two months of the marina opening and it was producing fowl water. One corner of the marina basin does not flush properly. The water in that corner is already red. It’s as if the excavated faces of the marina basin has pierced a flow of iron colour underground water to flow into the marina.
This colouring makes the water opaque. At low tide the water in the marina basin is below sea level, like a rock pool stranded by the tide. The opaque, stranded water heats up. On the 5 February at low tide the water temperature was 4 degree hotter in the marina basin than at the boat ramp, 500 metres away.
Worse is the overall water quality and the stuff that’s growing on the marina piers and boats below the water line. Petro-chemical slicks stick around for days and some weird looking stuff grows on the surface. The algae looking stuff on the piers and boats feels like jelly but alive and it’s growing very well.
Before the marina the estuary water was never this colour, the area did not amass petro-chemical spills, did not rapidly grow red / brown stuff. The opaque colouring, the petro-chemical build up and the algae (?) growth are environmental affects from the marina being constructed in that place.
Not enough tidal flushing is part of the problem. What did the Environment Court say about this matter when assessing the environmental affects?

Decision No. A 173 / 2005.
[44] Ms Sheffield went on to suggest that tidal flushing of the marina would not occur over a two day-day tidal cycle, contrary to evidence adduced for the society. Mr Caldwell stated in response that, in the light of calculations undertaken with the flushing rate, based upon a marina water depth of approximately 4.0m and a neap tidal range of greater than 1m, “ the ebb and flow during the tidal cycle and the mixing that that(sic)induces in the marina will be sufficient to ‘turn over’ the complete volume of the marina in two days (four tide cycles)” He went on to explain the reasoning supporting his view, and, having considered it against the concerns raised by Ms Sheffield, we accept that poor quality due to lack of flushing is not likely to be an issue on the basis of the works proposed in creating the marina basin and channel and maintenance dredging intended.

Good guess in theory but the Environment Court has got the reality wrong.

Thursday, February 11, 2010

Dirty deeds done dirt cheap.






Some of the fears expressed in Council hearings, Environment Court, High Court and Parliament, (the whole gamut of New Zealand environmental law), regarding a marina at Whangamata, were around the need for constant dredging as well as unregulated privatisation of foreshore and seabed.
Whangamata estuary has (had) three outstanding natural features close together, the Whangamata Bar (a sand bar surf spot rated internationally), a shellfish bed and a small but perfectly formed wetland. All of these features are in “Public” ownership. The wetland, now destroyed, is a carpark and gated (marine) industrial area, part of the marina project.
The occupational scope of the marina has increased spatially with the council giving over parts of the public boat ramp for dredging purposes. At no time in the 15 years of gaining consents for the marina was the use of the boar ramp signalled.
That the access channel needed dredging two months after it opened questions the sustainability of the marina and what drove (drives) the environmental planning and legal teams of those councils.
The channel that requires dredging runs through the middle of a shellfish bed. This shellfish bed has a biological history many thousands of years old and a cultural history of a thousand years. These histories along with the current use of the shellfish bed were a driver for Maori groupings to oppose the building of the marina.
These Maori groupings introduced an expert witness from the surfing community to the appeal process. The surfer’s argument was that the constant dredging of the channel puts at risk the quality of the Whangamata surfbreak. Surfers argue that the inner estuary delta was part of the sand reservoir for the Whangamata Bar. Dredging would also change water velocity flows within the estuary putting at risk the Bar’s morphology and its high quality.
The Councils spent millions of dollars degenerating the surfer argument at the time and continue to actively block or bypass concerns from representative groupings of surfers. Once the Councils have had their way with the environment, usually for the purposes of promoting marine estate, they will then announce they are ready to talk about it.
Dredging began on 5th of February without any public notice. Parliament stipulated that parties associated with the appeals were to be given a months notice of the dredging methodology so they could make comment on it. To bypass this stipulation the Regional and District Councils have crafted a twisting of the regulatory system. The District Council gets a dredging consent, which they then “give” (?) to the marina. The Regional Council then processes the consent behind closed doors.
This allows no public scrutiny of why dredging is required so soon or allow the Public to comment on methodology or perceived environmental effects.
The Regional Council’s representative in Whangamata (Harbourmaster) and the District Councils local chairperson, when asked, on 5th of February, why is dredging required so soon and how will the dredging be done, (both) replied we would have to address the marina developers. Basically the Councils want the marina developers to be the de-facto owners of Whangamata foreshore and seabed with everyone answering to them.
The methodology employed on 5th February 2010 was as follows. A barge with a long arm excavator digs out the channel placing the sediment on the barge. The barge then moves to the boat ramp (using the digger arm) and dumps the dredged material into the water on the inter-tidal flats. When the tide goes out another digger comes and scoops together the dispersed sediment and re-piles it further up the boatramp. This all happens below mean high springs in the coastal marine area.
The material is then, spread down the ski lane. There is no reason for this other than getting rid of the material. The other area it was dispersed was the north facing side of the children’s playground. The bank at this site had given way when stormwater lowed the beach profile last (2009) winter. This stormwater inundation was exasperated by the wetland being plugged.
This dredging methodology is new and has been developed by the Councils with the marina developers. It’s the methodology designers who are checking the quality of this methodology.

Tuesday, November 10, 2009

Mud magnet.






Mud sticks. Once accumulated it’s very hard to shift.
Sand rolls. In the wind, in storms. In water with tidal and current movements.
From the 11 to the 13th of October a group of Whangamata Camping Association (WCA) members walked and examined, around low tide, the recently excavated channel from the dugout marina basin down to the boat ramp. This part of the channel has never been dredged or altered previously.
The dredging and excavation is from a natural depth of .25 to .5 m to an artificial depth of 2m (at low tide). Rock walls and a weir structure have been placed in parts of the channel at the entrance to the excavated basin.
The most noticeable thing at such an early stage is the mud. The numerous black rock structures, only in the water months, are already deeply stained. Thick mud 5 to 10 cm thick has accumulated on the low tide flats behind the rock walls. All the marina structures are mud stained including the concrete pontoons.
The recently built weir has mud building on its surface. The structure is nearly always in moving water.
Where the rock wall ends a micro channel has formed. It runs from the low tide mark to a point 3 to 4 meters out from the rock wall and then runs (roughly) parallel to the dredged channel and joins up with (what was) a dead end channel opposite the boatramp (click on photos to enlarge.) The dead end channel opposite the boat ramp has been there for some time. The micro channel is new and came after completion of the rock wall around September 2009.
The most noticeable change is the increase in heights of the sediment banks on the western side of the causeway bridge. The increase in height has meant the channel has now carved faces into the sediment banks along its low tide meander, something that never happened previously.
The damming effect caused by the cauceway (built in 1974), is well documented. It has caused rapid infilling up stream with associated encroachment of flora. It was a known ecological disaster. Has this infilling now been accelerated?
While walking around the intertidal flats, WCA members were told by HeB workers on the site that crayfish had started living in the rock walls, and the marina is going to have problems with the channel and basin filling in.

Wednesday, September 23, 2009

Sand Mining at Whangamata



The photos in this post were taken form the same spot but different angles at the Whangamata boat ramp. The photo top shows the sand mining as a result of the Whangamata marina construction consents. The Public were never notified or told this was going to happen at the boat ramp. The sand is being excavated because the 1 kilometre channel connecting the excavated marina basin is naturally .25m - .5m deep at low tide. To operate the channel will require a depth of 1.7m at low tide.
The photo below shows in the right-hand foreground, the Whangamata boat ramp. It is river hardened sand and many people launch their boats in bare feet. Up to seven boats can be launched simultaneously. It is a safe boat ramp to use.
The rest of the channel can be seen meandering to the left. The line of poles mark the right hand side of the channel. It is this part of the channel where the piled sand has been mined.
What is clear is that months per year of sand mining will be required to keep the channel open, and that a dedicated spot on the foreshore and on land will be required to stack it. Yet the authorities have not told us yet where this will take place and who pays.

Friday, September 4, 2009

Perpetual un-notified consents?


The post of the 31 July 2009 was a submission by the Whangamata Camping Association to an application to the Waikato Regional Council (WRC). This application was for a coastal permit for exclusive occupation of foreshore at Whangamata. There are two other regulating authorities that also had a say in the application. These are the Thames Coromandel District Council (TCDC) who administer the boatramp, where the exclusive occupation is taking place, and the Department of Conservation who are seen as the owners of the foreshore and seabed on behalf of all New Zealanders.
The consent was granted to the private developers by WRC with input from TCDC and DoC around the date of 7 August 2009
The photograph below shows the sand bulwark under construction and the photograph above shows the structure with the machinery laying idle. When this machinery and structure is in use, it resembles a marine quarrying operation. The sand wharf structure has become larger since these photographs were taken.
The planners and lawyers who progressed the district and regional councils case through the courts and into Parliament, never forewarned that the boatramp would be given over to the private developers or that a marine quarrying operation would begin in a residential area.
The compliance officers at the District and Regional councils never knew this was coming until it was on their desk. Ten months into construction!
Part of the purpose of planners and lawyers who consult or work for Councils and Ministries is that they assess the effects of an application on behalf of those that pay them. They require some skills in understanding how something in a sensitive and controversial setting (the Whangamata estuary) will unfold.
The WRC, TCDC, and DoC are now saying that this sand and sheet steel bulwark and marine quarrying operation will be temporary. Are these authorities in control of the situation? How will the required dredging operations take place in the future?

Wednesday, August 19, 2009

Ch-ch-changes


The post of 31st July 2009 was a submission to Waikato Regional Council (WRC) by the Whangamata Camping Association (WCA) to an application by HeB Construction for a Coastal Permit to occupy the Coastal Marine Area (foreshore). Specifically the area to be occupied is the western portion of the Whangamata boat ramp. Occupation of the foreshore is requested for the temporary dumping of dredgings and the building of a temporary structure. The dredgings will come from the digging a 1kilometer channel, to a man made depth. The channel is required to connect a constructed marina basin to the open sea.
That an application to occupy the coastal marine area was applied for 10 months into the construction period is surprising. The area to be exclusively occupied is a long-standing amenity, it is safe, and it is often in use. It is seen as a Public asset.
The planners and lawyers who progressed the district and regional councils case through the courts and into Parliament, have huge power over people and their environment. They are hired and paid highly from rates and taxes to bring a studied rationale to the management of the coastal environment and river management. They failed to mention that the boatramp and the surrounding area would become a construction zone. They hid or didn’t understand what was going to happen. This problem is recurring, the difference between evidence to the court and actual reality.